Schedule for the 405 closure, Sept 29 – Oct 1, 2012

Unless you’re from another planet, you probably know that the 405, between Sunset and Ventura Blvds, will close over this weekend from Friday evening Sept  29 until early morning on Monday, October 1, in order to demolish the Mulholland Bridge Overpass.  As we know from the last July, it will all go smoothly if everyone cooperates and stays away from the  10-mile segment of the 405 being closed. This also applies to staying away from surface streets near the closure. Eat, shop, and play locally. We did it before. We can do it again.

Here is the schedule:

1) Ramps, along the route, will start closing at 7pm on Friday, September 29.
2) Lanes will start closing at 10pm on Friday.
3) The 405 will close down completely starting at 12:01 am on Saturday, Sept 30 as follows:

 a) The northbound lanes of the 405 will be closed from the 10 to the 101 freeways.

b) The southbound lanes of the 405 will be closed from the 101 to the Getty Center  Drive ramps.

c) The Mulholland Bridge and Haskell Ave ramps will be closed. The northbound 101 connectors from the 405 will be closed.

The 405 is scheduled to reopen on Monday, Oct 1, 15 at 5am.

 

 

 

 

 

 

 

 

Advertisements

About The Silver Strand News

Resident of the Silver Strand, Marina del Rey, California
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s